For heat pump, PV and insulation installers · Luxembourg

The Klimabonus side of the job, handled.

A workspace built around the Luxembourg subsidy scheme: the quote interview asks what the subsidy needs, the dossier moves through its steps, and the visibility work shows who gets asked.

Ten Screens, One Workspace.

  • Today
  • Board
  • Dossiers
  • Quotes
  • Draft
  • Treasury
  • Calls
  • Chat Intelligence
  • Leak Map
  • Visibility
  • Integrations

Board

  • Sample Dossier · Bettembourg Quote Sent

    Heat pump, 12 kW

  • Sample Dossier · Esch-sur-Alzette Waiting on Documents

    Photovoltaic, 10 kWp

  • Sample Dossier · Diekirch Filed by the Client

    Façade insulation

A sample workspace. The screens are the ones in production today.

What Runs Inside.

  • The Quote Interview

    Asks what the subsidy needs, not what a form wants.

  • The Dossier

    Moves through its steps up to the claim. For energy renovation it starts with the accord de principe, requested before the works begin, Article 3(4).

  • Treasury

    What is expected, and when.

  • The Leak Map

    Where demand exists and nobody is answering it.

  • Visibility

    Who gets found when someone searches for the work.

  • The Assistant on Your Own Site

    Answers on your own page, in your own colours, added with one tag.

In production at a Luxembourg installer.

The same workspace, built around the Luxembourg subsidy scheme: a quote interview that asks what the subsidy requires, a map of where demand is leaking, and the visibility work behind who gets asked.

In production. Its assistant sits on the installer's own site, added with one tag, in their colours.

For energy renovation, eligibility turns on the building being more than ten years old, counted from the date the building permit was delivered and checked at the date of the accord de principe request. Article 3(1) of the loi du 24 juillet 2026, published in Mémorial A n° 416.

For energy renovation, the request for the accord de principe goes in before the works begin. For every measure, the claim goes in within four years of 31 December of the invoice year.

Sample quote

Commune
Bettembourg
Heat Pump
12 kW, air-water
Photovoltaic
10 kWp on the roof
Klimabonus Route
Ordinary
Total Aid €12,000
A sample quote, with round example figures. Not a price, and not a decision on anyone's aid.
Where enquiries came from, sample data. Map data © OpenStreetMap contributors

The Subsidy

  • The scheme is the State's Klimabonus.
  • The amounts are the State's to decide.
  • The calculator on this site computes what the law provides, in the browser.
Open the calculator →

Also from Cadre.

Cadre is one company with three products.

The Local-Business Workspace →Attesta, for Fiduciaires →

Start with the quote interview.